Home · Products · Mine Scheduling
New product line · Planning to shift

Mine scheduling: from the monthly plan to every shift

Minocular Mine Scheduling turns the monthly mine plan into weekly and shift targets for every shovel, drill and blast. It decides which blocks to mine in which period while respecting bench precedence, fleet and crusher capacity and blend targets such as LSF. Because it runs on Minocular trip and production data, it re-plans from where the pit really is today.

Weekly mine schedule showing which bench each shovel, drill and blast works

What Mine Scheduling delivers

Plan to shift targets
Monthly and weekly plans broken down into shift targets for each shovel, drill and blast.
Block sequencing
Which block is mined in which period, respecting the benches above it.
Fleet and crusher limits
Shovel, truck and crusher capacity built into every schedule, so targets can be met.
Blend targets
Crusher feed kept inside LSF, silica-modulus and alumina-modulus bands using block-model grades.
Scenarios
Change fleet, availability or targets, rerun and compare scenarios side by side.
Re-plan from actuals
Trip and production data from Minocular show where the pit really is, and the plan updates from there.
One platform

Mine Scheduling is one part of the Minocular platform.

All capabilities share one equipment list, one shift calendar and one set of reports. Most mines start with one capability and add others later without a second integration.

See the whole platform →
Mine Scheduling
Fleet Management
Drone Survey
Fuel Monitoring
AI Safety Surveillance
Operations Dashboard
Predictive Maintenance
Mine Scheduling screens

From the plan to the crusher feed

Concept screens for the scheduling module. All figures on them are sample data.

Weekly schedule: Which bench each shovel works, with drilling, blasting and planned maintenance.
Weekly schedule
Which bench each shovel works, with drilling, blasting and planned maintenance.
Scenario compare: A shovel goes down for a week: compare the base plan, the impact and the re-plan.
Scenario compare
A shovel goes down for a week: compare the base plan, the impact and the re-plan.
Blend at the crusher: Planned LSF week by week against the target band.
Blend at the crusher
Planned LSF week by week against the target band.

Questions about mine scheduling

What is mine scheduling?

Mine scheduling decides which parts of the pit are mined in which period, and by which machines, so that production, quality and equipment limits are met. It turns the long-term mine plan into monthly, weekly and shift targets.

How is this different from dispatch?

Dispatch (Minocular OITDS) assigns trucks to shovels minute by minute during a shift. Scheduling sets what each shovel should mine over days and weeks. The schedule sets the targets that dispatch then works to.

Can it use our block model and mine plan?

Yes. Block models and plans from mine planning software can be imported as CSV or DXF with block IDs kept, and schedule changes can be exported back in the same form.

How does it keep crusher quality in range?

Each block carries its grades from the block model, so the scheduler can mix faces to keep the crusher feed inside the LSF and modulus bands set by the plant.

Is this module live?

Mine Scheduling is a new product line built on the Minocular platform. Book a demo to see the screens and discuss your mine plan.

Turn your mine plan into shift targets.

Share your current monthly plan; we will show it as a weekly schedule.