01 Allocation

Does the system allocate, or only track?

Ask to see a dumper being assigned to a shovel by the system, live or in a recorded demo. The Ministry of Coal's technology roadmap notes that most OITDS installations in Coal India only track vehicles; automatic allocation is the step it asks for next.

What the coal roadmap says →
02 Allocation

What does the allocation logic weigh?

Shovel capacity, haul distance, queue length and grade or blend targets should all be inputs. Ask how a dispatcher overrides an assignment and whether the override is logged.

03 Hardware

In-cab terminals that fit your mixed fleet

Check that the terminal fits every make in your fleet, not only one OEM, and ask for its ingress rating, mounting and power details. Ask who replaces a failed unit and how fast.

In-cab data terminals →
04 Network

What happens when the pit loses network?

Every pit has dead zones. The terminal should store data and send it when the link returns, so no trip is lost. Ask to see the gap and the catch-up in the records.

No-network mining →
05 Records

Per-trip records you can audit

Each trip should carry load point, dump point, times for every part of the cycle and payload. These are the records that settle contractor billing disputes.

The five parts of a haul cycle →
06 Records

Where payload comes from

Payload can come from on-board weighing, the weighbridge or a factor per truck. Ask which source is used for each machine and how the weighbridge is matched to trips.

07 Reports

Shift and statutory reports out of the box

Ask for sample shift, production and machine-hour reports in the format your mine files today, not a generic dashboard.

Statutory compliance →
08 Integration

Integration with what you already run

Weighbridge, fuel system, maintenance and ERP links should be listed with what data moves in each direction. Ask for an API or export format in writing.

09 Rollout

A rollout plan with named milestones

Hardware fitment, network, control room setup and operator training should each have a date and an owner. Ask who trains operators on each shift.

10 Support

Support on site, not only on email

Ask where the nearest support engineer sits, the response time for a terminal or server fault, and what uptime is committed in the contract.

Source

Ministry of Coal, Technology Roadmap for Coal Sector (May 2022), section 7

Says OITDS at Coal India is mostly used for tracking and plans full use with automatic allocation.

Open the source →
Puru Agrawal, Co-founder, Minocular
About the author

Puru Agrawal

Puru is a co-founder of Minocular. He works with mine owners and contractors across India on fleet dispatch, fuel and digitisation projects.

Questions about OITDS tenders

What should an OITDS tender ask for?

Automatic dumper-to-shovel allocation, in-cab terminals for the whole mixed fleet, store-and-forward when the network drops, per-trip records with payload, shift and statutory reports, integration with weighbridge and fuel systems, and on-site support.

How do I check that an OITDS really allocates trucks?

Ask for a live or recorded demonstration in which the system assigns a dumper to a shovel and the assignment appears on the in-cab terminal, with the dispatcher able to override and the override logged.

Is GPS tracking enough to meet an OITDS requirement?

Tracking shows where trucks are. An OITDS also decides where each truck goes next and records every trip, which is what the Ministry of Coal's roadmap asks for next.

What records should an OITDS keep for contractor billing?

Per-trip load point, dump point, cycle times and payload, with the payload source stated for each machine.

Does OITDS work in pits with poor mobile coverage?

It should. Terminals store data during a network gap and send it when the link returns, so trips are not lost.

Related
SOLUTION
OITDS truck dispatch
BLOG
OITDS in Coal India mines
PRODUCT
In-cab data terminals
INDUSTRY
Mining contractors
Run this checklist against Minocular OITDS.
Book a Demo