3-minute haulage game
On paper, the shift hits plan.
Set the fleet, make your call, then play 100 shifts. Average cycle times hide the queues and gaps that decide real tonnes.
The pit ⓘ
Plan says a shift. In how many of 100 shifts will it be met?
Result
Avg tonnes
Excavator idle
Queue / dumper
Your call
How this model works
Sources
- BEML BH35-2 brochure: 31,752 kg maximum payload.
- BEML BH60M brochure: 54,500 kg rated payload.
- Zeng, Baafi & Walker (2017), a simulation model to study bunching effect of a truck-shovel system.
- SAIMM (2007) on deterministic vs simulated shovel-truck fleet sizing.