Mine production reporting software compiles tonnes moved, trips, machine hours, fuel and downtime into shift, daily and monthly reports without retyping. The parts worth automating are the ones built from counted records: trips, tonnes, hours, fuel issued and breakdown times. Judgement calls, such as the reason for a delay or a geology note, still need a person, but they can be added to the same report instead of a separate register.

Control room screen with an automatically compiled mine production report
01 Definition

What a mine production report contains

A production report records what the mine moved and what it cost to move it. At an opencast mine that means tonnes of ore and overburden by pit, bench and material, trips per dumper and excavator, machine working and idle hours, fuel issued, breakdowns and delays. The same figures appear in the shift handover, the daily report to the mine manager, the monthly report to head office and the contractor bill.

02 The manual way

Why manual reports arrive late and disagree

In many mines the shift report is typed from trip slips, logbooks and phone calls after the shift ends. The daily report is then built from the shift reports, and the monthly report from the daily ones. Every step retypes numbers, so errors carry forward and different departments end up with different totals. The report also arrives after the shift, when nothing can be done about the shortfall.

03 Automate these

The parts that should be automatic

Anything built from a counted record can be compiled by software: trips and tonnes from GPS and geofences, weighbridge tickets, machine hours from ignition and engine data, fuel issued from the bowser or fuel station, and breakdown start and end times from the maintenance log. These are the numbers that are most often retyped and argued over, so they gain the most from coming straight from the source.

04 Keep a person

The parts that still need a person

Software can show that an excavator stood idle for 40 minutes; it cannot always say why. Delay reasons, blast and geology remarks, safety observations and the shift in-charge's notes still need a person. The aim is not to remove these, but to collect them in the same system against the same machine and time, so the report holds the number and its reason together.

05 One data set

One data set for every report

When the shift report, the daily report, the contractor bill and the statutory return all read the same trip, hour and fuel records, the totals agree by design. Month-end reconciliation then becomes a check between trip tonnes, weighbridge tonnes and survey volume, rather than a hunt for typing errors across spreadsheets.

Read: plan vs actual tonnes →
06 Checklist

What to ask of production reporting software

Ask where each number comes from and whether it is counted or typed. Check that reports are ready at shift handover, not the next morning. Check that users can choose the parameters, periods, formats and recipients, and that reports can be emailed on a schedule. Check that statutory formats are generated from the same records as the operational reports.

07 In Minocular

Shift reports compiled while the shift runs

Minocular's reporting engine compiles production, fleet performance, fuel and downtime for each shift from the platform's own trip, fuel and maintenance records, so the report is ready at handover. Statutory formats are generated from the same data, and reports can be scheduled and emailed to managers, head office or contractors.

See mine production reporting →
Puru Agrawal, Co-founder, Minocular
About the author

Puru Agrawal

Puru is a co-founder of Minocular. He works with mine owners and contractors across India on fleet dispatch, fuel and digitisation projects.

Questions about mine production reporting

What is mine production reporting software?

It is software that compiles tonnes moved, trips, machine hours, fuel and downtime into shift, daily and monthly mine reports from recorded data, instead of retyping figures from slips and logbooks.

Which mine reports can be automated?

Reports built from counted records: trips and tonnes, machine working and idle hours, fuel issued, breakdown times, contractor quantities and statutory returns that use the same figures.

What still needs manual input in a production report?

Judgement items such as delay reasons, geology and blast remarks, safety observations and shift in-charge notes. These are best entered in the same system against the same machine and time.

Why do manual production reports disagree?

Each report is retyped from the one before it, so errors carry forward and departments keep separate totals. Reading every report from one set of trip, hour and fuel records removes that source of disagreement.

Related
CAPABILITY
Mine production reporting
CAPABILITY
Mine operations dashboard
BLOG
Plan vs actual tonnes
BLOG
Fleet management system cost
See your shift report built while the shift runs.
Book a Demo