What plan vs actual means at a mine
Plan vs actual is the comparison of planned production with achieved production over the same period. At an Indian opencast mine the plan usually starts as the annual budget in tonnes of ore and overburden. It is then split into monthly targets and shift targets for each pit, bench or contractor. The actual is what the mine reports as moved in that shift, day or month.